The Bourbon Phase 2 project is delayed due to water levels along the Mississippi River. Last month, the contractor completely demobilized all labor and materials from the site and backfilled open trenches to minimize pedestrian and vehicular traffic disruption ahead of Mardi Gras. The project will continue when the river level drops below 15 feet at the Carrollton gauge, which is currently predicted to be on or around April 15. Until that time, the project area will continue to be demobilized.