June 30, 2020 | Category: District D | Tagged as: Canal Blvd
In June, crews finished installing new curbs and gutters and began pouring new sidewalks and driveways aprons. The northbound lanes of Canal Boulevard are scheduled to be complete in early July and the roadway will be opened to two-way traffic so work can begin on the southbound lanes between Robert E. Lee Boulevard and Amethyst Street.
May 29, 2020 | Category: District D | Tagged as: Canal Blvd
In May, Palmisano construction crews began installing new curb and gutters, marking out driveway aprons and sidewalks on the northbound side of Canal Boulevard between Robert E. Lee Boulevard and Amethyst Street.
April 30, 2020 | Category: District D | Tagged as: Canal Blvd
In April, Palmisano construction crews began removal of existing sidewalks and driveway aprons on the northbound side of Canal Blvd. between Robert E. Lee Boulevard and Amethyst Street. Installation of new sidewalks and driveway aprons will begin immediately afterward with completion expected next month.
March 27, 2020 | Category: District D | Tagged as: Canal Blvd
Palmisano construction crews completed installing new sewer lines in the 7400 block of Canal Boulevard and have begun installing new catch basins and connections to the new drain lines
March 3, 2020 | Category: District D | Tagged as: Canal Blvd
Last month, Palmisano construction crews completed installing drainage lines in the northbound lanes of Canal Boulevard and have begun preparations for installation of the new water lines.
The City of New Orleans and the Sewerage & Water Board are hiring.
Find jobs with the City
Find jobs with S&WB
Connect to First Source
You can contact us directly at roadwork@nola.gov or by phone at (504) 658-ROAD (7623).