Beverly Construction, LLC., crews continue to complete roadway operations thoughout the West End Group A project. Completed streets include Spencer Avenue (Pontchartrain Boulevard to Fleur De Lis Drive) and 40th Street (Avenue A to Fleur De Lis Drive). Crews also continue to work on new water and drainage lines. Connecting the new waterlines will happen sometime in the future, once the stay home orders have been lifted. Residents will continue to be informed ahead of any work that will involve utility disruption.
Due to the added precautions and additional scopes of work this project is now extended to fall 2020.
This $5.6M project was designed by Atkins, LLC. , Inc. and the scope of work varies block by block but includes the following:
- Patching the roadway with asphalt or concrete;
- Replacing damaged portions of concrete with new, level concrete;
- Repairing damaged curbs and gutters;
- Repairing damaged sidewalks and driveway aprons;
- Installing Americans with Disabilities Act-compliant curb ramps at intersection; and
- Replacing/repairing damaged underground water and drainage lines.
View a copy of the presentation given at the January public meeting here. To be added to the project contact list, and to track our progress, visit RoadWork.nola.gov.
For more information about this project and other upcoming work, please visit Roadwork.nola.gov or call 504.658.ROAD (7623).