Command Construction, LLC crews continued waterline tie-ins this month on the Little Woods Group A project. After several test closures, crews began performing tie-ins in July. All lines are expected to be tied in by late September.
Crews also continue to work on sidewalk restoration and driveway aprons throughout the project. Residents will continue to be notified of work that will impact their access and/or cause disruption to their utilities.
The scope of this $14M Patch, Mill, Overlay and Incidental Road Repair project varies by block but includes:
- Repaving the asphalt roadway from curb-to-curb;
- Patching the roadway with asphalt or concrete;
- Repairing damaged sidewalks and driveway aprons;
- Installing Americans with Disabilities Act-compliant curb ramps at intersections; and
- Replacing / repairing damaged underground water, sewer, and/or drainage lines.
Details of this project were first made available at the pre-construction public meeting. View a copy of the public meeting presentation and details about construction sequencing here.
For more information about this project and other upcoming work, please visit Roadwork.nola.gov or call 504.658.ROAD (7623).