Waterline replacements are continuing on the $4.5M St. Claude Group E full-depth reconstruction project. The project was designed by Hatch Engineering and is be constructed by Boh Bros. Construction.
Click here to view a map of all planned work on the project. The scope of work varies by block and includes the following types of work:
- Full Reconstruction: Repair sewage, water, and drainage line, rebuild the street entirely, and repair sidewalks and curbs;
The City of New Orleans hosted a virtual community meeting via WebEx in December 2020 discuss anticipated impacts. View a copy of the presentation here.
For more information about this project and other upcoming work, please visit roadwork.nola.gov or call 504.658.ROAD (7623).