The $4.4M Filmore South Group A project was designed by Volkert Inc. and is being constructed by Hard Rock Construction LLC. The project is currently more than 40 percent complete.
Roadway work is currently focused on the following streets: Miles, King, Moore, Overton, Mandolin and Hamburg. The scope of work varies by block but includes the following types of work:
- Patch Mill/Overlay: Repaving the asphalt roadway from curb to curb and repair damaged sidewalks;
- Patch Concrete: Removing damaged portions of the concrete roadway and replace it with new smooth concrete pavement;
- Incidental Road Repairs: Removing damaged portions of the asphalt roadway and replace it with new smooth pavement; and
- Non-Paving Incidentals: Repairing damaged sidewalks, driveway aprons and curbs within the public right-of-way.
The City hosted a pre-construction community meeting in August 2019 to discuss anticipated impacts. View a copy of the presentation here. To be added to the project contact list and to track our progress, visit RoadWork.nola.gov.