Crews from Beverly Construction are finishing new sidewalks and driveway aprons in the 800 and 900 blocks of Taft Place. The $2.2M full road reconstruction project is expected to wrap up within a month, and full street access is expected within the next two weeks.
The project began in July 2019 and has included repairing/replacing sewerage, water and drainage lines; rebuilding the street entirely; and repairing sidewalks, driveway aprons and curbs.
View a copy of the public meeting presentation here. To be added to the project contact list and to track our progress, visit RoadWork.nola.gov.
To be added to the project contact list and track our progress on this or other Roadwork projects, visit RoadWork.nola.gov or call 504-658-ROAD (7623).
The project began in July 2019 and has included repairing/replacing sewerage, water and drainage lines; rebuilding the street entirely; and repairing sidewalks, driveway aprons and curbs.
View a copy of the public meeting presentation here. To be added to the project contact list and to track our progress, visit RoadWork.nola.gov.
To be added to the project contact list and track our progress on this or other Roadwork projects, visit RoadWork.nola.gov or call 504-658-ROAD (7623).