The Lower Ninth Ward Northeast Group B project began in late June 2020. This $5.8M project was designed by Neel-Schaffer, Inc. and is being constructed by Fleming Construction Co, LLC.
This is a full depth reconstruction, but work varies block by block and may include:
- Replacing damaged underground water, sewer and drainage lines;
- Repaving the roadway;
- Replacing damaged sidewalks and driveway aprons; and
- Installing Americans with Disabilities Act-compliant curb ramps at intersections.
Information about this project was made available at a pre-construction public meeting on May 05, 2020. The presentation can be found here.
For more information about this project and other upcoming work, please visit Roadwork.nola.gov or call 504.658.ROAD (7623).