City of New Orleans contractor, Beverly Construction, recently added crews on the West End Group A project in order to remain on schedule. Despite additional scope on many blocks thoroughout the project, work is scheduled to be complete in summer 2020.
This $5.6M project, was designed by Atkins, LLC. , Inc.; the scope of work varies block by block but includes the following:
- Patching the roadway with asphalt or concrete;
- Replacing damaged portions of concrete with new, level concrete;
- Repairing damaged curbs and gutters;
- Repairing damaged sidewalks and driveway aprons;
- Installing Americans with Disabilities Act-compliant curb ramps at intersection; and
- Replacing/repairing damaged underground water, and drainage lines.
View a copy of the presentation given at the January public meeting here. To be added to the project contact list, and to track our progress, visit RoadWork.nola.gov.
For more information about this project and other upcoming work, please visit Roadwork.nola.gov or call 504.658.ROAD (7623).