Hard Rock Construction crews completed roadway paving and sidewalk work on Conti, S. Salcedo, Dupre and Gayoso streets on the Mid City Group A project. Crews also completed major water line repairs throughout the project.
The community will continue to be informed ahead of any work that will involve utility disruption and/or impact their parking and access to their streets. Residents are asked to continue to be mindful of ‘No Parking’ signs installed prior to roadwork. Vehicles are eligible for towing if not moved within 24 hours once signs are in place.
This project was designed by Infinity Engineering and is being constructed by Hard Rock Construction Co., LLC. The entire project was originally scheduled to be complete this fall; however, additional scope has been added. All work is now anticipated to be complete in winter 2021.
View a copy of the presentation here. To be added to the project contact list, and to track our progress, visit RoadWork.nola.gov.
The scope for the $6.3M project varies by block, but includes the following types of work:
- Patch Mill/Overlay: Repaving the asphalt roadway from curb to curb and repairing damaged sidewalks;
- Patch Concrete: Removing damaged portions of the concrete roadway and replacing it with new smooth concrete pavement;
- Incidental Road Repairs: Removing damaged portions of the asphalt roadway and replacing it with new smooth pavement; and
- Non-Paving Incidentals: Repairing damaged sidewalks, driveway aprons and curbs within the public right-of-way.
For more information about this project and other upcoming work, please visit Roadwork.nola.gov or call 504.658.ROAD (7623).