City of New Orleans Department of Public Works contractor Palmisano Construction is performing concrete pours on Bertha, Oriole, Cartier, Paris, and Lark streets. Excavation has begun on Perlita, Frankfort and Cartier streets in preparation for pours during the month of October.
Crews will continue to notify residents of any foreseen disruptions to traffic or access to driveways. The project is currently 67 percent complete.
This $2.5 million Lake Terrace Group A Incidental Road Repair project includes the following scope of work:
- Patching the roadway with asphalt;
- Replacing damaged portions of concrete with new, level concrete;
- Repairing damaged curbs and gutters;
- Repairing damaged sidewalks and driveway aprons;
- Installing ADA-compliant curb ramps at intersection; and
- Replacing/repairing damaged underground water and drainage lines.
The City hosted a pre-construction public meeting to discuss the project’s construction sequencing and anticipated impacts. View a copy of the public meeting presentation here.
For more information about this project and other upcoming work, please visit Roadwork.nola.gov or call 504.658.ROAD (7623)