Work is wrapping up in the $7.3M Village De L’Est Group B project. Crews are 100 percent complete with roadway restoration of Endeavors Court, Expedition Drive, Beaucaire Street, Cannes Street, and Toulon Street. Water line connections are nearing completion as well as ongoing sidewalk and driveway work.
Learn more about the project by viewing a copy of the public meeting presentation here.
The scope of work varies by block but includes:
- Repaving the asphalt and concrete roadway from curb-to-curb in some areas;
- Patching the roadway with asphalt in some areas;
- Repairing some damaged sidewalks and driveway aprons;
- Installing American with Disability Act- compliant curb ramp at intersections; and
- Replacing/repairing damaged underground water lines.
For more information about this project and other upcoming work, please visit Roadwork.nola.gov or call 504.658.ROAD (7623).