In September, pavement restoration began in the 6000-6300 block of Dorothea, 6500-7100 blocks of East Hermes, and the 5800 block of Dwyer. Sidewalks and driveways were installed in the 4500-4900 blocks of Virgilian, and crews continued making sewer line repairs on East Laverne and Morrison.