Command Construction, LLC. crews have completed several blocks of roadway construction as part of the Little Woods Group A project, including the roadway on West Laverne. This block was a full reconstruction that included new drainage lines. Crews are now working to complete adjacent blocks that do not include waterlines as they comply with the moratorium on waterline tie-ins related to COVID-19.
As construction continues, residents will be notified as work progresses on their block.
The scope of this $14M Patch, Mill, Overlay and Incidental Road Repair project varies by block but includes:
- Repaving the asphalt roadway from curb-to-curb;
- Patching the roadway with asphalt or concrete;
- Repairing damaged sidewalks and driveway aprons;
- Installing Americans with Disabilities Act-compliant curb ramps at intersections; and
- Replacing / repairing damaged underground water, sewer, and/or drainage lines.
Details of this project were first made available at the pre-construction public meeting. View a copy of the public meeting presentation and details about construction sequencing here.
For more information about this project and other upcoming work, please visit Roadwork.nola.gov or call 504.658.ROAD (7623).