This is the first of four construction projects planned for the Lake Terrace and Oaks neighborhood. Bounded by Robert E. Lee Boulevard, Franklin Avenue, Lakeshore Drive and St. Bernard Avenue, this project was awarded for $2.4M and includes the following types of work:
- Patch Mill / Overlay: Repave the asphalt roadway from curb to curb and repair damaged sidewalks;
- Patch Concrete: Remove damaged portions of the concrete roadway and replace it with new smooth concrete pavement;
- Incidental Road Repairs: Remove damaged portions of the asphalt roadway and replace it with new smooth pavement; and
- Non-Paving Incidentals: Repair damaged sidewalks, driveway aprons and curbs within the public right-of-way.
Currently, Palmisano Construction crews are scheduled to begin moving traffic control signs and barrels into the neighborhood and to begin marking out excavation sites in late January.
The Department of Public Works, working with the Sewerage and Water Board, is scheduled to host a public meeting to discuss construction sequencing and anticipated construction impacts in January. Sign up to receive Lake Terrace and Oaks Group A project updates here.