Command Construction Industries, LLC is scheduled to begin working on the Filmore North Group A contract in early February 2019. The contract award was delayed due to a contract protest.
The estimated budget, including engineering, design, geotechnical testing and construction planned in the entire Filmore neighborhood, is approximately $67M. This budget is likely to change pending project bids and construction costs.
Designed by Professional Engineering Consultants Corporation (PEC), the first project will include some waterline replacements a variety of work that varies by block:
- Patch Mill / Overlay: Repaving the asphalt roadway from curb to curb and repairing damaged sidewalks;
- Patch Concrete: Removing damaged portions of the concrete roadway and replacing it with new smooth concrete pavement;
- Incidental Road Repairs: Removing damaged portions of the asphalt roadway and replacing it with new smooth pavement; and
- Non-Paving Incidentals: Repairing damaged sidewalks, driveway aprons and curbs within the public right-of-way.
The City hosted a pre-construction community meeting in January 2019 to discuss anticipated construction impacts. View a copy of the presentation here. To be added to the project contact list, and to track our progress, visit RoadWork.nola.gov.