A sewer manhole repair was completed this month by Sewerage and Water Boards’ construction contractor, Wallace C. Drennan, Inc. at the intersection of Magazine St. and Washington Ave. Work included rebuilding 15 feet of the sewer manhole brick by brick, replacing four sewer pipes, replacing a collapsed 6” water line, repairing an 18” drainage line and restoration of the roadway.