Sewerage and Water Board representatives met with members of the Carrollton / Riverbend Neighborhood Association this month to update them on the construction of two elevated water towers at the nearby Carrollton Water Purification Plant. SWB engineers are installing two water tanks at the Carrollton Plant to act as water hammers. A water hammer is a pressure surge or wave caused when water is forced to stop or change direction suddenly.