Beverly Construction, LLC., began waterline tie-ins on Sierra Madre as part of the Read Boulevard East Group B project in August. After completion of work on the northbound side of the roadway they immediately began work on the southbound side.
Residents will continue to be notified of work that will impact their access and/or cause disruption to their utilities.
The scope of this $3.6M Patch, Mill, Overlay and Incidental Road Repair project varies by block but includes:
- Repaving the asphalt roadway from curb-to-curb;
- Patching the roadway with asphalt or concrete;
- Repairing damaged sidewalks and driveway aprons;
- Installing Americans with Disabilities Act-compliant curb ramps at intersections; and
- Replacing / repairing damaged underground water, sewer, and/or drainage lines.
Details of this project were first made available at the pre-construction public meeting. View a copy of the public meeting presentation and details about construction sequencing here.
For more information about this project and other upcoming work, please visit Roadwork.nola.gov or call 504.658.ROAD (7623).