All water main installations have been completed between Ring and Amethyst streets and all water line tie-ins have been completed at Jewel and Amethyst, so all houses from Ring to Amethyst are now connected to the new water main. In December, Palmisano construction crews began working on sewer line house connections at Amethyst Street and are working their way southbound. Catch basin tops are beginning to be formed between Ring Street and Jewel Street, and as catch basins are installed, crews will begin installing yard drains to the nearest catch basin.