Due to the high river, work in the Algiers Point area has been delayed until water level drops below 15 feet at the Carrollton Gauge. Durr Heavy Construction Co. is currently working on Anson Street and Rue Michelle for approximately five weeks. Both streets have full reconstruction planned, which includes repairing sewage, water, and drainage lines, rebuilding the street entirely and repairing sidewalks and curbs.