Construction is slated to begin in July on the full reconstruction of the 800 and 900 blocks of Taft Place. The scope of work for the $2.3M FEMA-funded project includes repairing sewer, water, and drainage lines; rebuilding the street entirely; repairing sidewalks and curbs; and installing Americans with Disabilities Act (ADA) compliant curb ramps.