Hard Rock Construction crews are continuing work on the $6.3M Mid-City Group A infrastructure and road improvement project. Currently, crews are preparing the roadway in the 2700 block of Conti for a temporary layer of asphalt to provide relief to residents and businesses along this corridor. There have been numerous unforeseen challenges on this block including three water leaks. As a result, the scope of the work on this block will be expanded to include a full waterline replacement as a part of the Mid-City Group B, currently in construction.