September 21, 2018 | Category: District C | Tagged as: Berkeley Dr, West Bank
Roubion Roads and Streets, LLC construction crews are currently 30 percent finished repairing damaged concrete panels on Berkeley Drive between Sullen Place and Bennett Street. Construction crews continue to excavate existing panels and frame portions of the roadway for weekly concrete placements.
August 14, 2018 | Category: District C | Tagged as: Pittari St.
The Department of Public Works’ construction contractor, Hard Rock Construction, LLC is 90 percent finished with the replacement of damaged concrete panels and installation of new curbs on Pittari Street from Tullis to Patterson drives.
August 14, 2018 | Category: District C | Tagged as: West Bank
Durr Heavy Construction, LLC crews have completed 12 percent of the Westbank Group A project scope. Crews continue to excavate damaged concrete panels and remove the top layer of asphalt pavement on several blocks including Thayer and Atlantic streets. Asphalt repaving work is scheduled to take place later this month. Concrete crews are working on framing up and installing new Americans with Disabilities Act-compliant curb ramps and sidewalks in the Whitney neighborhood.
August 14, 2018 | Category: District C | Tagged as: Berkeley Dr, West Bank
Roubion Roads and Streets, LLC construction crews are on-site repairing damaged concrete panels on Berkeley Drive from Sullen Place to Bennett Street.
July 17, 2018 | Category: District C | Tagged as: Pittari St.
The Department of Public Works’ construction contractor, Hard Rock Construction, LLC is currently 60 percent done with replacing damaged concrete panels on Pittari Street from Tullis to Patterson drives.
The City of New Orleans and the Sewerage & Water Board are hiring.
Find jobs with the City
Find jobs with S&WB
Connect to First Source
You can contact us directly at roadwork@nola.gov or by phone at (504) 658-ROAD (7623).